Safety Guidelines
- Follow the installation instructions.
- Apply the appliance
● according to its intended utilise
● in good status
● with due regard to safety and run a risk of danger. - Note that the appliance is exclusively for use in the applications detailed in these installation instructions (run across 2 Technical Data). Whatsoever other apply will not be considered to comply with requirements and would invalidate the warranty.
- Please have note that whatever associates, commissioning, servicing and adjustment piece of work may only exist carried out by authorized persons.
- Immediately rectify any malfunctions which may influence safety.
Technical Data
| Media | |
| Medium | Drinking water |
| Connections/Sizes | |
| Connection size: | DN65 – DN200 |
| Discharge pipe connection: | DN150 |
| Pressure level values | |
| Min. inlet pressure: | 1.5 bar |
| Max. operating pressure: | 10 bar |
| Operating temperatures | |
| Max. operating temperature medium: | 65 °C (WRAS threescore °C) |
| Specifications | |
| Installation position: | Horizontal with belch valve downwards |
Options
For Options visit homecomfort.resideo.com/europe
Assembly
Installation Guidelines
- Install shut-off valves before and after backflow preventer
- Install backflow preventer downstream of the filter or strainer This protects the appliance against dirt
- Install in horizontal pipework with the discharge valve downwards
- Ensure skillful access Simplifies maintenance and inspection
- In order to avoid flooding, information technology is recommended to arrange a permanent, professionally dimensioned wastewater connectedness
- The installation environment should be protected against frost and ventilated well
- Install discharge pipework which has acceptable capacity
- These armatures need to be maintained regularly
Associates in structions
- Thoroughly flush pipework
- Ensure that connections on back flow preventer are make clean
- Install backflow preventer
- Install in horizontal pipework with discharge connection directed down
● Notation menstruation management (indicated by arrow)
● Install without tension or bending stresses - Provide a straight section of pipework of at to the lowest degree five times the nominal valve size after the backflow preventer
- Maintain assembly distances
- Load the middle screw only in axial direction
- Connect discharge pipework close coupled and without tight bends according to connexion dimensions (see tabular array)
- Install discharge pipework in such a way that the belch connection and the discharge valve can exist removed for inspection
Maintenance
In order to comply with EN 806-five, water fixtures must be inspected and serviced on an almanac basis. Equally all maintenance work must exist carried out by an installation visitor, information technology is recommended that a servicing contract should be taken out.
In accordance with EN 806-five, the following measures must be taken:
Inspection
The inspection should also include ancillary equipment such as strainers and shut-off valves.
Testing inlet check valve
Take note of the instructions of the test control unit TKA295
- Procedure according to instruction of the test control unit TKA295
Testing discharge valve
Take note of the instructions of the test control unit TKA295
- Procedure according to instruction of the examination control unit TKA295
Quick test for the belch valve:
- Lower the inlet pressure
– if the belch valve opens (it drops), the function is o.chiliad.
Testing outlet check valve
Take note of the instructions of the test command unit of measurement TKA295
- Procedure according to instruction of the examination command unit TKA295
Maintenance
Do not use whatsoever cleansers that contain solvents and/or alcohol for cleaning the plastic parts, considering this can cause damage to the plastic components – water damage could issue.
Detergents must not be immune to enter the environment or the sewerage system!
Discharge valve
- Close shut-off valve on inlet
- Close close off valve on outlet
- Release force per unit area using the 3 ball valves
- Unscrew pressure level command line
- Open screws on the chapeau
- Remove cover
- Push clench together and remove
- Remove discharge valve upwards
● Clean or replace equally required - Grease O-rings for drinking water installation well with admissible greasing agent, supplant damaged O-rings
- Reassemble in reverse gild
- Exam function (see 5.i Inspection)
Check valve
- Close shut-off valve on inlet
- Close shut-off valve on outlet
- Release pressure using the three brawl valves
- Open screws on the lid
- Remove cover
- Push button clamp together and remove
- Twist securing ring out of the receiving slot
Circumspection!
! Adventure of injury – Cheque valves are under spring tension! - Pull out the check valve
● disassemble the outlet check valve first, and the inlet check valve
● Make clean or replace as required
● Leaking check valves must exist replaced.
● If the edge seals are worn, you can switch the cases of the 2 check valves with each other (see conversion check valves) - Reassemble in reverse society
● Grease the O-ring on the check valve with greasing agent admissible for drinking water
● Exercise not harm `O' ring during associates
● Securing band Pos. seven (moving-picture show five.2.ii.) that the opening is facing down - Test function (see v.i Inspection)
Conversion check valves
Caution!
Take a chance of injury – Cheque valves are under spring tension!
- Detach both bank check valves by loosening the hexagon bolt
- Assemble the housing of the inlet cheque valve with the components of the outlet backflow preventer
- Assemble the housing of the outlet bank check valve with the components of the inlet check valve
Disposal
Discover the local requirements regarding correct waste recycling/disposal!
Troubleshooting
| Problem | Cause | Remedy |
| Belch valve opens without credible reason | Pressure strokes in h2o supply system | Install a pressure reducing valve upstream the backflow preventer |
| Fluctuating inlet pressure | Install a pressure reducing valve upstream the backflow preventer | |
| Inlet bank check valve and/or belch valves are dingy | Remove check valve or discharge valve and clean it | |
| Leaky inlet check valve | Supervene upon check valve | |
| Discharge valve don't close | Deposits on valve seat | Remove discharge valve, clean or supplant it |
| Damaged 'o'ring | Remove belch valve and replace 'o'band | |
| Leaky discharge valve | Remove discharge valve, make clean or supercede information technology | |
| Belch valve don't open | Blocked force per unit area control pipe | Remove control pipage and make clean it |
Spare Parts
For Spare Parts visit homecomfort.resideo.com/europe
Accessories
For Accessories visit homecomfort.resideo.com/europe
Manufactured for and on behalf of Pittway Sàrl, Z.A., La Pièce 4, 1180 Rolle, Switzerland
For more data homecomfort.resideo.com/europe
Ademco 1 GmbH, Hardhofweg xl, 74821 MOSBACH, Frg
Phone: +49 6261 810
Fax: +49 6261 81309
© 2022 Resideo Technologies, Inc. All rights reserved.
Documents / Resources
Source: https://manuals.plus/resideo/ba300-braukmann-class-4-backflow-preventer-rpz-valve-manual
Posted by: whiteblaying1956.blogspot.com

0 Response to "How To Install Double Check Valve Backflow Preventer"
Post a Comment